LATEST
NEWS

Richard Humphreys
/ Categories: News

Jeffrey Brauer to address water issues at Iron Horse

Golf course architect Jeffrey Brauer has been hired by the city of North Richland Hills in Texas, to renovate its municipal Iron Horse golf course.

“The primary focus of the project at Iron Horse will be on correcting the situations of too little and too much water on the course, respectively,” said Brauer, who can make the short trip from his adopted home in the Dallas-Fort Worth metroplex. “New irrigation for the entire course will be plotted and installed to satisfy the main issue – it is the first priority.”

The 18-hole public facility was designed by Dick Phelps and opened in 1988. It was built in a floodplain and runoff from the growth in urban development has increased.

“We will address the track’s lowest lying fairways to counter its battle with periodic flooding that has forced the course to be out of play a few times a year,” said Brauer. “Elevating the lowest lying fairways for more flood protection and increasing surface pitch for better drainage will be nearly as important.”

A few greens and most bunkers have also been negatively impacted by flooding and will be renovated or removed. Topsoil will also be replaced in areas where fast flowing waters have worn it off.

“The course was built for the city of North Richland Hills by a management company, who prided themselves on being able to build cheaply,” said Brauer. “In reality, they didn’t value engineer anything, they just left things out. An extra US$300,000 in 1989 would have probably reduced the need to spend US$3 million in 2019 to add what was left out in terms of drainage, flood control, and irrigation coverage.”

Brauer also seeks to open up playing corridors. “Iron Horse is a very solid and well-liked golf course overall, but if there is a complaint from golfers it has been the narrowness of the play corridors. Those issues will be addressed in the renovation as we create increased playability and a more open course.”

Plans should be finished by early autumn with construction expected to start by the end of the year, so grassing can occur at a peak time of May-June 2020 to best assure an October reopening.

“This project is a great example of a targeted renovation, fixing the most important problems without doing a total redo,” said Brauer. “I believe it will be the model for public course renovations moving forward.

“For a while, total renovations seemed to make sense, as those who did them experienced greater revenues to offset costs. With more and more re-branded golf courses, it doesn’t seem like spending more leads to more revenues, and it is wise to fix what is broken, what customers complain about, and let the original design – in this case, a nice Dick Phelps 1980s era public design – be the best it can be. Besides, unlike most courses these days, play isn’t down – well, a bit, but still playing 45,000 rounds – so putting a new design stamp on it doesn’t seem necessary.”

Vickie Loftice, managing director of community services, and Joe Pack, senior park planner, will oversee the project for the city.

“Jeff is well known for being able to supply a lot of ‘bang for the buck’ in municipal renovations, which was one of our key considerations in selecting his firm over others who were interested in our project,” said Loftice. “This is a situation where things may need to change some over the course of the renovation and, in his previous work, Jeff has shown an ability to adapt his ideas, his plans and his focus as needed – and that was important for us.”

Brauer’s firm GolfScapes has retained EC Design Group for irrigation design, while Halff Associates will provide hydraulic studies that will allow permitting under current regulatory processes. The course is managed by Arcis Golf, who will also provide agronomic consulting. Long-time golf course superintendent Kevin Ramsey will provide local insight to Brauer and his team.

Previous Article New 10-hole par-three course taking shape at Forest Dunes
Next Article Gaunt returns to Meltham for final phase of remodelling project
Print
4109 Rate this article:
No rating
Slideshow HTML
  • Iron Horse

    Jeffrey Brauer has been hired for a targeted renovation of the Iron Horse municipal course in Texas

  • Iron Horse

    Brauer will focus on water issues and widening playing corridors

Richard Humphreys

Richard HumphreysRichard Humphreys

Other posts by Richard Humphreys
Contact author

Contact author

x
Winter 2024 issue of ASGCA’s By Design magazine is out now
Magazine, News | Wed 11 Dec, 2024

Winter 2024 issue of ASGCA’s By Design magazine is out now

Golf course architects take on the challenge of redesigning the Road hole at St Andrews

The October 2024 issue of Golf Course Architecture is out now!
Magazine, News | Thu 17 Oct, 2024

The October 2024 issue of Golf Course Architecture is out now!

The Keep at McLemore, a Bill Bergin-Rees Jones mountaintop design in northwest Georgia, features on the cover

FEATURE
ARTICLES

Taking time to recapture character
Inwood Country Club
Opinion | Daniel Friedman

Taking time to recapture character

Inwood’s Daniel Friedman talks about how the New York club has spent the last 20 years trying to make up for the previous 80 years of change that had slowly eroded the character of its Herbert Strong-designed course

A masterpiece comes into view
Cobbs Creek
Opinion | Mark Wagner

A masterpiece comes into view

Mark Wagner provides an update on progress of the revival of Cobbs Creek

Bill Amick: Long calling for short
ASGCA
Interview | Adam Lawrence

Bill Amick: Long calling for short

Adam Lawrence spoke to the designer about his life and his attempts to encourage golfers to play shorter courses

The triumph of the Dyeciples
ASGCA
Feature | Adam Lawrence

The triumph of the Dyeciples

Adam Lawrence asks why architects who trained with Pete Dye are so dominant in today’s golf design business

The Keep: On top of the world
Evan Schiller
On site | Richard Humphreys

The Keep: On top of the world

Richard Humphreys reports on a new layout that is destined to catch the eye. Designed by Bill Bergin and Rees Jones, McLemore’s second course occupies a spectacular setting on a mountaintop plateau

Goodwood: Down in the woods
Report | Richard Humphreys

Goodwood: Down in the woods

Golf At Goodwood has a new practice facility designed by James Edwards and built by MJ Abbott

Cedar Rapids: Blown away
Vaughn Halyard
On site | Adam Lawrence

Cedar Rapids: Blown away

After an acclaimed 2015 restoration by Ron Prichard, Iowa club thought it was set fair for the future. But Mother Nature had other ideas, says Adam Lawrence

North Ranch: Time for transformation
North Ranch CC
Report | Richard Humphreys

North Ranch: Time for transformation

Fifty years after it was originally laid out, the Ted Robinson layout has been re-envisioned by Jackson-Kahn Design and rebuilt by Landscapes Unlimited

Team building
Turfgrass
Interview | Richard Humphreys

Team building

Turfgrass has launched its US arm with the appointment of John Lawrence, Adam Moeller and Brad Owen. Richard Humphreys speaks with them, Turfgrass founder John Clarkin and director of agronomy Julian Mooney to find out more

Birdie Act: An end to templates?
Kevin Murray
Feature | Adam Lawrence

Birdie Act: An end to templates?

Legislation before the US Congress would extend the copyright protection that currently exists for buildings architecture to golf course design. But would that preclude the construction of classic hole designs, asks Adam Lawrence?

The art of project management
Leeds Golf Design
Opinion | Giulia Ferroni

The art of project management

Giulia Ferroni of Leeds Golf Design spells out the intricacies of executing a masterplan and the skills required from a golf course architect

Gopher Watch Competition – October 2024
Gopher Watch, News | Mon 21 Oct, 2024

Gopher Watch Competition – October 2024

Which course has Sandy the gopher visited this month?

MOST
POPULAR

FEATURED
BUSINESSES