LATEST
NEWS

Richard Humphreys
/ Categories: News

Doak says ‘focus on excitement’ was key for Memorial Park

Memorial Park golf course in Houston, Texas, reopened for play this month following a renovation by Tom Doak.

The municipal course was completely rebuilt, with Doak given a brief to make it playable for both the public and professional golfers. It will host the Houston Open on the PGA Tour in 2020. Brooks Koepka joined Doak as a consultant for the project, providing input on how to make the course a good test for Tour players.

“The balance between municipal golf and the pro tour was a big part of what Tom and Brooks talked about,” said Project manager and contractor Don Mahaffey of Greenscape Methods. “I feel it’s one reason there are only 19 bunkers on the course. Brooks said bunkers are easy for the Tour pros but difficult for the amateurs. So, there are fewer bunkers tight to greens but lots of tight grass slopes and contours. The 10 handicap players can get up onto the green and have a putt for par. But the Tour pro is going to have a longer shot — the green surround slopes repel shots — and it’ll be a tight lie to an elevated green. Brooks felt that would challenge them and be easier for the muni player. Plus, bunkers are expensive to build and maintain in rainy Houston.”

“During the opening day tournament, we played with a professional and he felt the course was a great test for good players,” said Mahaffey. “In the week we’ve been open I’ve talked to at least 100 regular players and, I kid you not, every review has been positive.”

Doak said: “From my perspective, the key to making the course work for Tour players and the general public was to focus on excitement rather than trying to keep the pros’ scores to a certain range. There are some tough par-four holes out there for sure.”

The closing stretch, culminating in the long par-four eighteenth, has been designed for the possibility of significant swings in scoring. “The fans will love it and the players will hopefully embrace it, knowing they have to be aggressive to succeed,” said Doak.

Holes thirteen to fifteen are a short par four, short par five and short par three, and the par-five sixteenth has water on three sides of the green. Doak says the sixteenth is reachable in two for the pros but there is no place to bail out if you go for it.

Read more: Tom Doak spoke with GCA as construction work began

Mahaffey says that key to the project was the expansion of the irrigation storage reservoir from 2.5 acres to almost nine. “That generated the fill we needed to improve surface drainage,” he said. “We felt we had to complete all that lake work, have fill in place, new wet well and pump station installed, and be filling the lake in 90 days. We were filling the lake 88 days after gaining approval to start.

“After that, Tom’s shapers got the fills and golf features shaped and we followed with drainage, irrigation and sandcapping. While we had milestones we knew we had to hit, we really never developed a daily schedule — I know that sounds unconventional, but I never wanted our staff to feel comfortable. Our objective was to get as much done as we could every day, with the goals of hitting our major milestones.

“We are very pleased with the stormwater detention/rainwater harvest system we built,” continued Mahaffey. “It was a big part of the mandate and the entire team worked very hard to create a system that met all the desired harvesting and detention goals and made for great golf.

“I’ve watched the storage reservoir we built fill with rainwater and I was on the course 30 minutes after we got nine inches of rain in three hours. The areas that used to erode held up perfectly as the course metered the water out just as designed.”

Previous Article Vast new dune system for next stage of Prince's works
Next Article Construction complete at Kevin Norby’s new Fox Hills design
Print
6310 Rate this article:
No rating
Slideshow HTML
  • Memorial Park

    Memorial Park in Texas has reopened for play following a renovation by Tom Doak

  • Memorial Park

    The course was completely rebuilt

  • Memorial Park

    Doak’s brief was to make the course playable for the public and a test for Tour golfers

Richard Humphreys

Richard HumphreysRichard Humphreys

Other posts by Richard Humphreys
Contact author

Contact author

x
The October 2024 issue of Golf Course Architecture is out now!
Magazine, News | Thu 17 Oct, 2024

The October 2024 issue of Golf Course Architecture is out now!

The Keep at McLemore, a Bill Bergin-Rees Jones mountaintop design in northwest Georgia, features on the cover

Fall 2024 issue of ASGCA’s By Design magazine is out now
Magazine, News | Tue 10 Sep, 2024

Fall 2024 issue of ASGCA’s By Design magazine is out now

Cover story focuses on how today’s architects have been inspired by the links courses of Britain and Ireland

FEATURE
ARTICLES

Cedar Rapids: Blown away
Vaughn Halyard
On site | Adam Lawrence

Cedar Rapids: Blown away

After an acclaimed 2015 restoration by Ron Prichard, Iowa club thought it was set fair for the future. But Mother Nature had other ideas, says Adam Lawrence

North Ranch: Time for transformation
North Ranch CC
Report | Richard Humphreys

North Ranch: Time for transformation

Fifty years after it was originally laid out, the Ted Robinson layout has been re-envisioned by Jackson-Kahn Design and rebuilt by Landscapes Unlimited

Team building
Turfgrass
Interview | Richard Humphreys

Team building

Turfgrass has launched its US arm with the appointment of John Lawrence, Adam Moeller and Brad Owen. Richard Humphreys speaks with them, Turfgrass founder John Clarkin and director of agronomy Julian Mooney to find out more

Birdie Act: An end to templates?
Kevin Murray
Feature | Adam Lawrence

Birdie Act: An end to templates?

Legislation before the US Congress would extend the copyright protection that currently exists for buildings architecture to golf course design. But would that preclude the construction of classic hole designs, asks Adam Lawrence?

The art of project management
Leeds Golf Design
Opinion | Giulia Ferroni

The art of project management

Giulia Ferroni of Leeds Golf Design spells out the intricacies of executing a masterplan and the skills required from a golf course architect

Brian Curley: Life of Brian
Brian Curley
Interview | Adam Lawrence

Brian Curley: Life of Brian

The designer has surely clocked up more air miles than anyone else in the business. Adam Lawrence caught up with him in between flights to discuss his career and his new venture with Jim Wagner

Spey Bay: Old and new
CDP
On site | Adam Lawrence

Spey Bay: Old and new

Scottish club is a very old-fashioned links with very modern ownership, an interesting mix, says Adam Lawrence

The Club at Golden Valley: Golden and modern
Peter Wong
Report | Richard Humphreys

The Club at Golden Valley: Golden and modern

Kevin Norby has completed a centennial project at Minnesota course, to modernise infrastructure and restore much of AW Tillinghast’s design philosophy

The Club at Quail Ridge: Turning up the contrast
Fry/Straka
Report | Richard Humphreys

The Club at Quail Ridge: Turning up the contrast

Fry/Straka and NMP Golf Construction embark on a huge rebuild of the North course, five years after the South was renovated

Minchinhampton GC: Striving for sustainability
Minchinhampton Golf Club
| Matthew Mears

Minchinhampton GC: Striving for sustainability

Matthew Mears discusses the benefits a ClearWater washpad recycling system has realised for the Cotswolds club

Native Links: A new era of native-owned courses
Cal Nez Designs
Good Read | Mark Wagner

Native Links: A new era of native-owned courses

Mark Wagner discusses the topic of his new book: the relationship and history between Native Americans and golf

Gopher Watch Competition – October 2024
Gopher Watch, News | Mon 21 Oct, 2024

Gopher Watch Competition – October 2024

Which course has Sandy the gopher visited this month?

MOST
POPULAR

FEATURED
BUSINESSES