27 intentionally, that the original design was very tight, and the corridors were very narrow. So, where we are using the existing corridors – which is very rare, almost every hole is routed in a different fashion from that golf course – we are making them significantly wider.” Construction will start in 2019 and the course could be playable by 2020. Photo: Les Bordes Golf International “I have fallen in love with the property,” said Hanse. “We’ll probably stay there February through May, which should give us a lot of time to do a very good start on the feature construction and also establish the template for the look and for the style that we’re going for.”
RkJQdWJsaXNoZXIy NzQ1NTk=